Point Pleasant Park
mh_inside_Halterm.jpg
Education
Shoreline

ShorelineReport

 Point Pleasant Park Storm Waves and
Shoreline Restoration Technical Report
January 2009

In 2008 HRM engaged Coldwater Consulting Limited to further the work on shoreline restoration at Point Pleasant Park.

In keeping with the Point Pleasant Park Comprehensive Plan (HRM 2008), the consultants provided an extensive study on the effects of waves, storms, and sea level change on the shoreline of Point Pleasant Park. 

 

 

 

 

Point Pleasant Park Storm Waves and Shoreline Restoration Technical Report January 2009 (full document 26 Mb PDF)

ChapterContentFile Size
Table of Contents, Introduction, Design CriteriaProject introduction, PPP shoreline evolution, design criteria, and proposed work.22 Mb PDF
Meteorological and Oceanographic Condiditons

Waves, tides, storms & the Point Pleasant Park shoreline.

1.8 Mb PDF
ModellingWave models and simulations; how waves work offshore of Point Pleasant Park.1.2 Mb PDF
Design Conditions, Conceptual Designs, Quantity and Cost Breakdown, Bibliography, Appendix Conceptual designs for the Point Pleasant Park shoreline.1.2 Mb PDF